So after a little while with work taking up all of my days and into the night. This weekend we ducked up home to see Mum and Dad but I wanted to get some work done on the loom so took it along with me.
Managed to get both connectors nearly finished so just need to triple check everything with the multimeter to make sure I didnt put a pin in the wrong place.
Sunday, May 18, 2014
Pinning Out Connector
Sunday, May 11, 2014
HD30 Connectors
So far so good. This afternoon was spent pinning out the connectors and finalising some of the heat shrink.
Wednesday, May 7, 2014
More Heat Shrink arrived.
Needed to be a 150min order so got 6mtrs of 1/4, 3/8 & 1/8 sized HellermannTyton SE28 Mil Spec shrink as well as proper Mil spec connector boots that are adhesive lined as well.
Monday, May 5, 2014
Flex Fuel Sensor Arrived
If you are after a flex fuel sensor then highly recommend
"universelinkauto" as an ebayer. Cheap and the delivery was quick being just over 1 week from purchase.
Here is the sensor up close.
Sunday, May 4, 2014
Loom progress
I have made some more progress on tue loom, this weekend was spent documenting each wire colour and connector as well as tue connector pin. Whilst I havent finished the aim is to allow easy trouble shooting should the need arise.
I also have started to put the motorsport heat shrink over the main section of the loom, because I wanted to test everything first this meant I had to remove the AMP connector and pins along with the Deutsch DTM and DT connectors, it was a bit difficult bit I managed to get part the way there and then realised I had run out of heat shrink. Will have to order some more on Monday as well as some pin removal and insertion tool's for the Deutsch HD30 connector as I forgot to order them with the connectors.